A Brief Report on Fieldwork at Göbekli Tepe in 2016

The Tepe Telegrams

(A contribution by Lee Clare)

In 2016 construction work commenced on two permanent shelters at Göbekli Tepe. These structures will provide additional protection from the elements (wind, sun and rain) to archaeological features in excavation areas in the south-eastern and north-western parts of the site. Fieldwork in spring and autumn of this year concentrated on the documentation of prehistoric architecture in areas affected by building activities. Additional time was spent in the site find-depots, including sorting and inventory work of stored archaeological materials. These measures were essential in preparation for pending analyses and studies taking place in the frame of the recently initiated research phase.

In the course of our excavations at one of the positions assigned to shelter support constructions in the so-called main excavation area in the south-eastern hollow, work was concentrated on the previously unexcavated part of a rectangular stone structure (‘Room 38’ in trench…

View original post 225 kelime daha

Yorum bırakın